5.6MW Condensing Hot Water Boiler In City First Hospital

5.6MW Condensing Hot Water Boiler In City First Hospital

5.6MW Condensing Hot Water Boiler In City First Hospital

Tonnage: 5.6MW

Application: ward, office building heating, etc.

Introduction

The split condensing hot water boiler adopts a fully automatic controller. Once it is put into use, the boiler can be automatically operated, and the water level and water temperature can be automatically adjusted without human support. At the same time, the boiler has multiple protection systems, which can be shut down in time for sudden failures such as overpressure, over-temperature, low water level, power failure, undervoltage, overcurrent, short circuit, etc., to ensure safe operation of the boiler. The use of high temperature and corrosion resistant materials greatly extends the service life of the boiler.

Copyright © 2019 Boiler. All Rights Reserved.